... newer stories
1st instalment paid
2012-05-04 18:13
This means: "Base constructed and substantial completion of wall and roof frame."
I was allowed to visit the construction site.
The first thing I saw was 'my' house, especially the colours (the same as the shed) were unmistakable.
The steel frame inspires confidence - the Termites and White Ants will lose their last teeth.
I was allowed to visit the construction site.
The first thing I saw was 'my' house, especially the colours (the same as the shed) were unmistakable.
The steel frame inspires confidence - the Termites and White Ants will lose their last teeth.
... older stories