A Rottweiler in Australia
Monday, 13. August 2012
My letter to the Company
2012-08-13 14:39
Dear Sir or Madam,

Re: General Maintenance

1. I would appreciate if you would send a person to fix the 'Termifloor' sheet floor. There are several sheets hanging loose and one sheet (near the pipes on the south-east corner of the house) is broken and parts are missing.

2. According to the house plan there should be "450 mm deep shelves to pantry". There are no shelves. I remember a conversation with the person of G. Custom Joinery. He asked me about the shelves in the pantry and the cloakroom as well. I passed the query to D. K. and he had a consultation with someone of the Company. The answer D. transferred to me was: "The Company will take care of the shelves!"

3. I'm not happy with the work of Mr E. S.. He left a lot of dirt and was not honest in his statement. He wrote: "Hairline crack in ceiling (living room), patched and sanded, not painted. No ceiling paint left on job." The crack was in the wall (not ceiling) of the kitchen (not living room) and there was plenty of paint left. (I now asked the tiler to improve the weird repair.)

He overlooked a missing light bulb (outside the house - south face) and a cover of the power point in the 'office' (not to mention that he didn't look underneath the house - then he would have seen the loose 'Termifloor' sheets!

4. You attached a 'Statement of Compliance' for the Council but you didn't sign it. I therefore send it back to you so that you may place your signature (who ever is eligible to do so).


With kind regards

Permalink (2 comments)   comment



Friday, 10. August 2012
Work goes on
2012-08-10 15:41
The 'umbilican cord' = power cable to the house has been laid yesterday and today Telstra (telephone company) will come and use the same trench. This does not mean I do have power. AGL will instal the meter on 23rd of August and then I'm really (!) connected.



The same day the septic tank (like a big 'shit pot') has been delivered.



The plumber was busy and worked well.



(Although he managed to damage an electric wire at the house).

Permalink (4 comments)   comment



Tuesday, 7. August 2012
Still sore
2012-08-07 11:22
Clare is still lame and we are unable to go for a bicycle ride. The 'good' side is that she has no intention to chase other animals or explore the surroundings on herself. Laying in front of the house and just watching what's going on [please admire the new registration tag: this year sunny yellow].



Because I thought she is a giant dog I finally measured her: 70 cm at the withers.

The standard:

Height at withers:
For bitches is 56 - 63 cm.
56 - 57 cm is small / 58 - 59 cm is medium height / 60 - 61 cm is large - correct height / 62 - 63 cm is very large
Weight: approximately 42 kg

Permalink (3 comments)   comment